Get things sorted out for Glue Machine removal

Added by Alec Habig 5 months ago. Updated about 1 month ago.

Status:
New
Priority:
Normal
Assignee:
Category:
-
Start date:
09/12/2024
Due date:
% Done:

100%

Estimated time:
(Total: 0:00 h)

Description

Figure out what needs pulled off of the glue machine before it can be cut up. We had been told the control panel. Touched base with Steve Magill at Argonne last week via email, and he seemed to have forgotten that. So, we need to follow up with that to prepare for when we get the time to start cutting.

Andy from UMD safety says that the hazardous materials disposal truck could come up for the vaseline drums (plus whatever other lightbubs and whatnot).


Subtasks 2 (0 open2 closed)

General #30: Contact Argonne about machineClosed09/12/2024

Actions
General #31: Ship control boxesClosed09/12/2024

Actions