Actions
Detector #34
closedDetector #33: Detector Recovery
Phase 2 swaps
Status:
Closed
Priority:
High
Assignee:
-
Category:
-
Start date:
09/12/2024
Due date:
% Done:
0%
Estimated time:
Description
We believe the case of most errors are due to corrosion of the cable and not the FEB. In this phase we plan on swapping the ribbon cables of the 70 FEBs on the detector to determine how many are recovering from this swap. This will also give us the only quantitative data we will have to date about ribbon cable swaps.
The swaps will happen in two steps, each 1/2 of the detector.
Actions