Project

General

Profile

Actions

Detector #36

closed

CRU1 wash

Added by Matt N 6 months ago. Updated 5 months ago.

Status:
Closed
Priority:
High
Assignee:
Category:
-
Start date:
09/26/2024
Due date:
10/25/2024
% Done:

100%

Estimated time:

Description

CRU1's dry cooler fins have deposits on them from running well water. The fins need to be washed with a solution to remove the residue. Also, we should purchase a in-line carbon filter to reduce future residue.

Trying to do this before it's too cool out.

Actions #1

Updated by Tina L 5 months ago

  • Status changed from New to Resolved
  • Assignee set to Tina L
  • % Done changed from 0 to 100
Actions #2

Updated by Karl K 5 months ago

  • Status changed from Resolved to Closed
Actions

Also available in: Atom PDF