Project

General

Profile

Actions

Detector #33

closed

Detector Recovery

Added by Matt N 3 months ago. Updated about 1 month ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Category:
-
Start date:
09/12/2024
Due date:
% Done:

100%

Estimated time:
(Total: 0:00 h)

Description

Most of the work has been done in phase 1 of the campaign to recovery the detector from a high humidity event. This will track the rest until the detector is considered within normal maintenance.


Subtasks 1 (0 open1 closed)

Detector #34: Phase 2 swapsClosed09/12/2024

Actions
Actions

Also available in: Atom PDF