Detector #33
closedDetector Recovery
Status:
Closed
Priority:
Normal
Assignee:
-
Category:
-
Start date:
09/12/2024
Due date:
% Done:
100%
Estimated time:
(Total: 0:00 h)
Description
Most of the work has been done in phase 1 of the campaign to recovery the detector from a high humidity event. This will track the rest until the detector is considered within normal maintenance.